{{ c.name }}
{{ c.scope }}
{{ c.stage }}
Boiler Upgrade Scheme grant
£7,500
off an air source heat pump, deducted from your quote upfront.
Up to £9,000 for off-gas-grid oil and LPG homes. 0% VAT on installation to March 2027. Only MCS-certified installers can claim it, which is why MCS is first on our roadmap.
What you would pay
Illustration only. Every project is quoted after a survey and heat-loss calculation.
What we install
Three trades that only pay back when they are designed together. We size all three off the same heat-loss model.
Roof survey, array layout and inverter sizing, with battery storage where the tariff justifies it. Generation modelled against your actual consumption, not a national average.
Air source and hybrid systems sized by calculation, with emitters and pipework checked to run at low flow temperatures. £7,500 Boiler Upgrade Scheme grant handled on your behalf.
Insulation, airtightness, glazing and ventilation, designed as one package. New space built to the same standard as the fabric we upgrade behind it.
The full cycle
One practice is accountable from the first survey to the second-year performance check. Nothing is handed over halfway.
{{ stage.body }}
Three markets, one engine
{{ m.body }}
Accreditation roadmap
A new practice with an honest register is easier to assess than an old one with a wall of badges. Each entry carries its status, its owner and its date. Certificates are linked the day they are issued.
{{ c.status }}
{{ c.note }}
The model
Contracted with you. Invoiced by us.
Registered trades, named on every project.
Portfolio
Every project we complete will be published with the measures delivered, the before-and-after energy figures and the funding scheme used. Until then this page stays empty of other people's buildings.
{{ p.body }}
{{ p.meta }}Enquiry
Tell us the building and the outcome you want. You will get a reply from the engineer who would run the job, not a call centre.
{{ sentBody }}
What's involved
{{ svc.involvedBody }}
{{ row.body }}
How this one runs
{{ p.body }}
{{ p.meta }}{{ svc.extraKicker }}
{{ svc.extraBody }}
{{ p.body }}
{{ p.meta }}{{ b.name }}
{{ b.status }}
{{ f.a }}
Enquiry
{{ svc.formBlurb }}
{{ sentBody }}
Accreditations & compliance
Four statuses, no ambiguity. Held means the certificate is current and linked. In progress means the application is submitted and dated. Planned means the target quarter is set. Partner-held means a named accredited partner carries it and we coordinate the work.
Last reviewed {{ reviewDate }}. If you are assessing us for a framework and need something that is not here, ask and we will tell you whether we hold it.
Legend
{{ c.scope }}
{{ c.stage }}
Build note, not for launch: statuses, dates, insurers and certificate links on this page are placeholders. Replace with live record data before publishing — a wrong accreditation claim disqualifies a tender permanently.
Listed exactly as our applications stand. Nothing is described as awarded before it is.
{{ s.name }}
{{ s.body }}
Roles named per project, in writing, before work starts.
Social value
We do not have delivery history to quote. What we will do is write these into the contract, report against them quarterly and publish the figures as they accrue.
{{ s.theme }}
{{ s.commit }}
{{ s.measure }}
Enquiry
Send the lot reference or the scheme and we will reply with the documents your evaluation needs.
{{ sentBody }}
Contact
Surveys are booked within a week across {{ region }}. For tenders, use the procurement enquiry on the public sector page so the reference reaches the right place.
Enquiry
No obligation, no sales call. A reply from the engineer who would run the job.
{{ sentBody }}